|
IMPORTANT NOTES |
| Ensure that RC
Pool Shell is well aged (6 weeks or more), tested & proven |
Maintain mosaic
joints at 2-3mm wide. |
| to be
water tight before commencement of rendering/screeding. |
Movement joints must be incorporated
according to the requirements of |
| Bonding Agent
must be tacky or wet when Latex
Modified Cement-Sand |
British Standard BS 5385 or Malaysian Standard MS 1294. |
| Render
or Screed mortar is applied. |
Shelter must be
provided when rendering/screeding and
fixing/grouting |
| Spread adhesive
to small areas of approx. 1mē at a time, to prevent surface |
mosaics to external swimming pools. |
| drying
or Skin-Over of adhesive bed. Ensure Solid-Bed-Fixing. |
The water
filling rate of swimming pools should not exceed 750mm per day. |
| Belcem
Fix & Grout Functions both as
adhesive bed & grouting mortar |
|
| for
mosaics. |
|